Ship-Day Loop (SDL)
Goal: Push a real artifact live today, even if ugly.
The Ship-Day Loop is a 4-hour deep-work block with one rule: something public goes live by the end. It splits the time into 4 passes — spec, build, ship, post-mortem — and forces a real artifact: a post, a PR, a deploy, a video, a tweet thread.
The tasks
- 1. Spec the artifact (1 paragraph) est. 15m
What does "shipped" mean by hour 4? Write it down.
- 2. Build pass (no polish, no perfection) est. 150m
Ugly is fine. Boring is fine. Missing is not.
- 3. Ship pass (deploy, publish, post) est. 30m
Public artifact only. Drafts do not count.
- 4. Post-mortem: what would I cut or double next time? est. 15m
Score the loop 1-5. One line on next ship-day.
When to run it
Best for: Indie hackers, solo founders, designers shipping in public.
Run it now
Click below to open the workspace with this template pre-loaded. Your data stays on this device.
Open Loop workspace